RIBA Stages 5-6

Onsite Construction - Completion


Whilst onsite we offer two methods of service and will make a recommendation on the suitability of either in the early stages of Stage 1-2 briefing. The primary factors in recommending this is based on the mix of site time required of us during the build, the level of budget, level of design to be delivered and clients experience working with a main contractor.

Below is an overview of the level of service within each role:

Client design consultation:

  • Minimum monthly site visits at key points to review fundamental areas of the design install or sampling / mockups.

  • Review of specialist sub-contractors fabrication drawings

  • Answer contractor / client queries on the design drawings.

  • Client requests for changes to the design.

  • Pre-practical completion snagging lists / inspection reports.

Site monitoring and contract administration:

  • Pre-construction start meeting.

  • Additional details required by the main contractor to complete the build.

  • Attendance of fortnightly site meetings with the main contractor and the client

  • Reporting on quality and compliance with contract drawings

  • Review of specialist sub-contractors fabrication drawings

  • Client requests for changes to the design.

  • Issue interim payment certificates following contractor monthly valuations.

  • Issue Architects instructions & practical completion certificates in line with the building contract.

  • Pre-practical completion snagging lists